How to get scaffolding prepared for Building wrap
Contents |
[edit] Introduction
Perhaps the hardest part of wrapping a building is getting the scaffolding ready and safe for the building wrapping installation.
The scaffolding can only be designed and erected by a qualified scaffolding contractor, who, if necessary, will have access to engineers to calculate wind loads and so on. These wind load calculations are very important, otherwise winds could pull the scaffold structure down.
Getting the scaffolding designed to accommodate the building wrap from the beginning is very important. Trying to modify the scaffolding structure once it has been erected is expensive and sometimes is not possible.
For more information on scaffolding contractors please visit NASC (National Access & Scaffolding Confederation www.nasc.org.uk) which is recognised as the national trade body for access and scaffolding in the UK, producing a wide range of industry guidance for scaffolding contractors, their operatives and their clients. Members of the NASC are strictly regulated to ensure a continuous high standard of scaffolding practice.
[edit] How to wrap a building
The building wrap needs to be installed onto a picture-frame scaffold structure which projects about 300mm further than the last projected pole of the main scaffolding. This will allow the building wrap banner to move back and forth in the wind without fouling on any poles. Projecting scaffold poles should also be capped to cover sharp ends. If any part of the building wraps banner fouls on anything it will eventually wear though and the banner integrity will be compromised.
For more information see: Building wraps.
[edit] Related articles on Designing Buildings Wiki
- Building wraps.
- CDM.
- Debris netting.
- Demolition.
- Facade retention.
- How to remove scaffolding.
- Rubble chute.
- Scaffold register.
- Temporary works.
- Types of crane.
- Types of scaffolding.
- Work at height.
- Work at height checklist for managers.
- Work at height regulations.
- Working platform.
[edit] External references
- BS5975:2008 + A1: 2001 Code of Practice for Temporary Works Procedures and the Permissible Stress Design of Falsework (BSI 2011).
- The National Access And Scaffolding Confederation (NASC).
- Scaffolding Safety Tips
- Building wrap specialist: Project Print Management
Featured articles and news
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.


















