How to get scaffolding prepared for Building wrap
Contents |
[edit] Introduction
Perhaps the hardest part of wrapping a building is getting the scaffolding ready and safe for the building wrapping installation.
The scaffolding can only be designed and erected by a qualified scaffolding contractor, who, if necessary, will have access to engineers to calculate wind loads and so on. These wind load calculations are very important, otherwise winds could pull the scaffold structure down.
Getting the scaffolding designed to accommodate the building wrap from the beginning is very important. Trying to modify the scaffolding structure once it has been erected is expensive and sometimes is not possible.
For more information on scaffolding contractors please visit NASC (National Access & Scaffolding Confederation www.nasc.org.uk) which is recognised as the national trade body for access and scaffolding in the UK, producing a wide range of industry guidance for scaffolding contractors, their operatives and their clients. Members of the NASC are strictly regulated to ensure a continuous high standard of scaffolding practice.
[edit] How to wrap a building
The building wrap needs to be installed onto a picture-frame scaffold structure which projects about 300mm further than the last projected pole of the main scaffolding. This will allow the building wrap banner to move back and forth in the wind without fouling on any poles. Projecting scaffold poles should also be capped to cover sharp ends. If any part of the building wraps banner fouls on anything it will eventually wear though and the banner integrity will be compromised.
For more information see: Building wraps.
[edit] Related articles on Designing Buildings Wiki
- Building wraps.
- CDM.
- Debris netting.
- Demolition.
- Facade retention.
- How to remove scaffolding.
- Rubble chute.
- Scaffold register.
- Temporary works.
- Types of crane.
- Types of scaffolding.
- Work at height.
- Work at height checklist for managers.
- Work at height regulations.
- Working platform.
[edit] External references
- BS5975:2008 + A1: 2001 Code of Practice for Temporary Works Procedures and the Permissible Stress Design of Falsework (BSI 2011).
- The National Access And Scaffolding Confederation (NASC).
- Scaffolding Safety Tips
- Building wrap specialist: Project Print Management
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Historic England publishes research into embodied carbon when retrofitting traditional buildings.
New Prime Minister delivers on ECA call for cut in electricity costs.
CIOB reacts to the announcement of Andy Burnham as Prime Minister.
Heritage and conservation science workforce survey - Have your say.
England's Suburbs 1820-2020. Book review.
New, more proportionate and targeted approach for higher-risk building assessments.
Government brings British Steel into public ownership.
UKCW Birmingham returns with bold new theme and focus.
New guidance published on competence requirements for self-certification schemes.
Construction Management, 8 July
NEETs crisis drives interest in trades, but apprenticeships barriers remain.
Passive fire protection webinar
MEP services penetration seals.
Where its at podcast (and video) - The role of the Architectural Technologist as an Expert Witness.